PROJECT OVERVIEW
PROJECT OVERVIEW
This project included 55 cm diameter stone column construction in order to control the settlements caused by road embankment and to eliminate the risk of liquefaction.
PROJECT DETAILS
- Proje Adı Kuzey Marmara Otoyolu Kesim-5 Darbeli Kırma Taş Kolon İşi
- Firma Cengiz İnşaat San. Tic. A.Ş.
- Konum Sevindikli / KOCAELİ
- Yıl 2017 - 2018
Within the scope of the project, a total of 520.000 lm of vibro stone columns in varying depths were constructed.
By working in 3 shifts and 24 hours with 5 vibro hammers and 3 CFAs, the total length was completed in period of 3 months.